Titan Electric has implemented Stub-EASE™ to replace over 8000 traditional conduit stubs on a recent project they were awarded in Chicago’s loop. This has yielded a savings in excess of $50,000 in material and lost productivity and has eliminated over 8000 trip hazards.

“Jeff – Regarding the referenced subject & as discussed this morning, following are preliminary costs & cost savings for the deck sleeves. As mentioned, Titan will install approximately 8000 sleeves (1/2” & 3/4” combined) for this Block 37 project… which will yield a cost savings of $51,450.00.
Michael Jobe │ Project Manager – TITAN ELECTRIC